×

Central Forty

Location
Basingstoke
Architect
Michael Spark Associates
Main Contractor
MACE

The project utilised an aluminium curtain walling grid to cover the complete envelope with insulated panels behind prefabricated cedar and aluminium panels. This obviated the need for separate block or stud work on the inside and allowed the shifting of surfaces on each floor without loosing the advantage of full CW mullions spans across 3 floors. The staircases, plant room were clad in a more traditional manner.